{"id":1809,"date":"2026-02-14T04:27:46","date_gmt":"2026-02-14T04:27:46","guid":{"rendered":"https:\/\/books.gw-project.org\/an-introduction-to-hydraulic-testing-in-hydrogeology\/chapter\/ch082-xhtml\/"},"modified":"2026-08-01T10:07:16","modified_gmt":"2026-08-01T10:07:16","slug":"exercise-2","status":"publish","type":"chapter","link":"https:\/\/books.gw-project.org\/an-introduction-to-hydraulic-testing-in-hydrogeology\/chapter\/exercise-2\/","title":{"raw":"Exercise 2","rendered":"Exercise 2"},"content":{"raw":"<div id=\"section-1\" class=\"level1\">\r\n<div data-custom-style=\"First Paragraph\">\r\n<div data-custom-style=\"First Paragraph\">\r\n\r\nA pumping test is conducted on a production well located in an extensive, isotropic, homogeneous, 25\u2011m thick, totally confined, sand and gravel aquifer. The production well has a 15 m screened interval. The well is pumped at a constant rate of 1,200 m<sup>3<\/sup>\/d for 240 minutes. Time\u2011drawdown data are collected at three observation wells located 61 m, 122 m, and 244 m from the pumping well as shown in the image below. An Excel\u00ae data base of the time\u2011drawdown data is available on the <a href=\"https:\/\/gw-project.org\/books\/an-introduction-to-hydraulic-testing-in-hydrogeology-basic-pumping-slug-and-packer-methods\/\">web page for this book<\/a>\u2197.\r\n\r\n<\/div>\r\n<div data-custom-style=\"Captioned Figure\">\r\n\r\n<img style=\"display: block; margin-left: auto; margin-right: auto; ;width: 5.83333in; height: 3.01226in;\" src=\"https:\/\/books.gw-project.org\/an-introduction-to-hydraulic-testing-in-hydrogeology\/wp-content\/uploads\/sites\/40\/2026\/08\/file150-3.jpg\" alt=\"\" \/>\r\n\r\n<\/div>\r\n<div data-custom-style=\"Block Text\">\r\n<blockquote>Information related to Exercise 2. A production well is pumped at a constant rate in a totally confined isotropic and homogeneous aquifer that is infinite in lateral extent. Time\u2011drawdown data are collected from three observation wells. Configuration of the pumping well location, screen length and location of the observation wells are shown in cross section. Time\u2011drawdown data sets for the three observation wells are presented (modified from Lohman, 1972).<\/blockquote>\r\n<\/div>\r\n<ol type=\"a\">\r\n \t<li>Prepare log\u2011log pots of the time\u2011drawdown data for each of the observation wells. Using manual or automated curve matching, determine values of transmissivity and storativity for each data set.<\/li>\r\n \t<li>Compare and contrast the values computed. Should they all be the same? If not, how would you present the results to the well owner?<\/li>\r\n \t<li>Analysis of pumping a confined aquifer can also be accomplished using the Cooper\u2011Jacob straight line method. Plot the time\u2011drawdown data for the observation well located at 122 m from the pumping well as a semi\u2011log plot and determine <em>T<\/em> and <em>S<\/em>. Compare these results to the results from the part (a) type curve analyses, and comment on their similarity or differences.<\/li>\r\n \t<li>The confined time\u2011drawdown data can also be interpreted using the distance\u2011drawdown method. Make a semi\u2011log plot of the distance\u2011drawdown data at 100 minutes and calculate <em>T<\/em> and <em>S<\/em>. Compare these results to those derived from type curve and time\u2011drawdown straight line analyses. Discuss why the values are similar or different.<\/li>\r\n \t<li>Using the distance\u2011drawdown plot examine the efficiency (i.e., measured drawdown divided by theoretical drawdown) of the production well. If the production well diameter is 0.20 m and the drawdown at 100 minutes in the pumping well is 12.34 m, what is the efficiency of the pumping well?<\/li>\r\n \t<li>The well is planned to be used to supplement the city water system. After a seasonal supply evaluation, it was decided to pump the well for 200 days at a constant rate of 1,000 m<sup>3<\/sup>\/d. There are other wells in the area and a regulatory agency wants to know if other wells would be affected when this well is pumped. Ignoring the effects of pumping in the other wells, what is the predicted drawdown 1000 m from this well at the end of the pumping period?<\/li>\r\n<\/ol>\r\n<div data-custom-style=\"Block Text\">\r\n<blockquote><a href=\"\/an-introduction-to-hydraulic-testing-in-hydrogeology\/chapter\/solution-exercise-2\/#solution-exercise-2\">Solution to Exercise\u00a02<\/a><\/blockquote>\r\n<\/div>\r\n<div data-custom-style=\"Block Text\">\r\n<blockquote><a href=\"\/an-introduction-to-hydraulic-testing-in-hydrogeology\/chapter\/an-opportunity-to-work-with-pumping-test-data-from-a-confined-aquifer\/#TextLinkToExer2\">Return to where text linked to Exercise\u00a02<\/a><\/blockquote>\r\n<\/div>\r\n<\/div>\r\n<\/div>","rendered":"<div id=\"section-1\" class=\"level1\">\n<div data-custom-style=\"First Paragraph\">\n<div data-custom-style=\"First Paragraph\">\n<p>A pumping test is conducted on a production well located in an extensive, isotropic, homogeneous, 25\u2011m thick, totally confined, sand and gravel aquifer. The production well has a 15 m screened interval. The well is pumped at a constant rate of 1,200 m<sup>3<\/sup>\/d for 240 minutes. Time\u2011drawdown data are collected at three observation wells located 61 m, 122 m, and 244 m from the pumping well as shown in the image below. An Excel\u00ae data base of the time\u2011drawdown data is available on the <a href=\"https:\/\/gw-project.org\/books\/an-introduction-to-hydraulic-testing-in-hydrogeology-basic-pumping-slug-and-packer-methods\/\">web page for this book<\/a>\u2197.<\/p>\n<\/div>\n<div data-custom-style=\"Captioned Figure\">\n<p><img decoding=\"async\" style=\"display: block; margin-left: auto; margin-right: auto; ;width: 5.83333in; height: 3.01226in;\" src=\"https:\/\/books.gw-project.org\/an-introduction-to-hydraulic-testing-in-hydrogeology\/wp-content\/uploads\/sites\/40\/2026\/08\/file150-3.jpg\" alt=\"\" \/><\/p>\n<\/div>\n<div data-custom-style=\"Block Text\">\n<blockquote><p>Information related to Exercise 2. A production well is pumped at a constant rate in a totally confined isotropic and homogeneous aquifer that is infinite in lateral extent. Time\u2011drawdown data are collected from three observation wells. Configuration of the pumping well location, screen length and location of the observation wells are shown in cross section. Time\u2011drawdown data sets for the three observation wells are presented (modified from Lohman, 1972).<\/p><\/blockquote>\n<\/div>\n<ol type=\"a\">\n<li>Prepare log\u2011log pots of the time\u2011drawdown data for each of the observation wells. Using manual or automated curve matching, determine values of transmissivity and storativity for each data set.<\/li>\n<li>Compare and contrast the values computed. Should they all be the same? If not, how would you present the results to the well owner?<\/li>\n<li>Analysis of pumping a confined aquifer can also be accomplished using the Cooper\u2011Jacob straight line method. Plot the time\u2011drawdown data for the observation well located at 122 m from the pumping well as a semi\u2011log plot and determine <em>T<\/em> and <em>S<\/em>. Compare these results to the results from the part (a) type curve analyses, and comment on their similarity or differences.<\/li>\n<li>The confined time\u2011drawdown data can also be interpreted using the distance\u2011drawdown method. Make a semi\u2011log plot of the distance\u2011drawdown data at 100 minutes and calculate <em>T<\/em> and <em>S<\/em>. Compare these results to those derived from type curve and time\u2011drawdown straight line analyses. Discuss why the values are similar or different.<\/li>\n<li>Using the distance\u2011drawdown plot examine the efficiency (i.e., measured drawdown divided by theoretical drawdown) of the production well. If the production well diameter is 0.20 m and the drawdown at 100 minutes in the pumping well is 12.34 m, what is the efficiency of the pumping well?<\/li>\n<li>The well is planned to be used to supplement the city water system. After a seasonal supply evaluation, it was decided to pump the well for 200 days at a constant rate of 1,000 m<sup>3<\/sup>\/d. There are other wells in the area and a regulatory agency wants to know if other wells would be affected when this well is pumped. Ignoring the effects of pumping in the other wells, what is the predicted drawdown 1000 m from this well at the end of the pumping period?<\/li>\n<\/ol>\n<div data-custom-style=\"Block Text\">\n<blockquote><p><a href=\"\/an-introduction-to-hydraulic-testing-in-hydrogeology\/chapter\/solution-exercise-2\/#solution-exercise-2\">Solution to Exercise\u00a02<\/a><\/p><\/blockquote>\n<\/div>\n<div data-custom-style=\"Block Text\">\n<blockquote><p><a href=\"\/an-introduction-to-hydraulic-testing-in-hydrogeology\/chapter\/an-opportunity-to-work-with-pumping-test-data-from-a-confined-aquifer\/#TextLinkToExer2\">Return to where text linked to Exercise\u00a02<\/a><\/p><\/blockquote>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"author":8,"menu_order":75,"template":"","meta":{"pb_show_title":"on","pb_short_title":"","pb_subtitle":"","pb_authors":[],"pb_section_license":""},"chapter-type":[],"contributor":[],"license":[],"class_list":["post-1809","chapter","type-chapter","status-publish","hentry"],"part":599,"_links":{"self":[{"href":"https:\/\/books.gw-project.org\/an-introduction-to-hydraulic-testing-in-hydrogeology\/wp-json\/pressbooks\/v2\/chapters\/1809","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/books.gw-project.org\/an-introduction-to-hydraulic-testing-in-hydrogeology\/wp-json\/pressbooks\/v2\/chapters"}],"about":[{"href":"https:\/\/books.gw-project.org\/an-introduction-to-hydraulic-testing-in-hydrogeology\/wp-json\/wp\/v2\/types\/chapter"}],"author":[{"embeddable":true,"href":"https:\/\/books.gw-project.org\/an-introduction-to-hydraulic-testing-in-hydrogeology\/wp-json\/wp\/v2\/users\/8"}],"version-history":[{"count":6,"href":"https:\/\/books.gw-project.org\/an-introduction-to-hydraulic-testing-in-hydrogeology\/wp-json\/pressbooks\/v2\/chapters\/1809\/revisions"}],"predecessor-version":[{"id":3703,"href":"https:\/\/books.gw-project.org\/an-introduction-to-hydraulic-testing-in-hydrogeology\/wp-json\/pressbooks\/v2\/chapters\/1809\/revisions\/3703"}],"part":[{"href":"https:\/\/books.gw-project.org\/an-introduction-to-hydraulic-testing-in-hydrogeology\/wp-json\/pressbooks\/v2\/parts\/599"}],"metadata":[{"href":"https:\/\/books.gw-project.org\/an-introduction-to-hydraulic-testing-in-hydrogeology\/wp-json\/pressbooks\/v2\/chapters\/1809\/metadata\/"}],"wp:attachment":[{"href":"https:\/\/books.gw-project.org\/an-introduction-to-hydraulic-testing-in-hydrogeology\/wp-json\/wp\/v2\/media?parent=1809"}],"wp:term":[{"taxonomy":"chapter-type","embeddable":true,"href":"https:\/\/books.gw-project.org\/an-introduction-to-hydraulic-testing-in-hydrogeology\/wp-json\/pressbooks\/v2\/chapter-type?post=1809"},{"taxonomy":"contributor","embeddable":true,"href":"https:\/\/books.gw-project.org\/an-introduction-to-hydraulic-testing-in-hydrogeology\/wp-json\/wp\/v2\/contributor?post=1809"},{"taxonomy":"license","embeddable":true,"href":"https:\/\/books.gw-project.org\/an-introduction-to-hydraulic-testing-in-hydrogeology\/wp-json\/wp\/v2\/license?post=1809"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}